Kitchen Remodel Cost in Austin, TX (2026 Pricing Guide) | Pro Tech Construction

Pro Tech Construction | Austin, TX

A kitchen remodel in Austin typically runs $30,000 to $150,000+, depending on layout, square footage, cabinet grade, and stone selection. Cosmetic refreshes start around $30,000, mid-range remodels with layout changes run $50,000 to $85,000, and full custom kitchens run $90,000 and up.

After remodeling kitchens across Austin, Buda, Kyle, Bee Cave, Dripping Springs, Westlake Hills, and South Austin for 45 years, we’ve found the real number almost never comes down to square footage alone. It comes down to cabinet grade, stone selection, and whether walls or plumbing are moving. Every Pro Tech kitchen, at every tier, starts with a 3D rendering, so you see the finished space before we touch a wall.

Cost at a Glance

TierCost RangeCabinetryCountertopsLayout
Cosmetic Refresh$30,000–$50,000J&K modularQuartzSame footprint
Mid-Range$50,000–$85,000Belmont semi-custom or upgraded J&KQuartz, quartzite availableMinor adjustments
High-End Custom$90,000–$150,000+Belmont semi-custom or true full-custom cabinetryQuartzite or marble, waterfall islandWalls and plumbing relocated

What Actually Drives the Cost

Square footage and cabinet count. A bigger kitchen needs more boxes, more countertop, more flooring, and more lighting circuits to run.

Cabinet grade. J&K modular costs less because it’s built from standardized components. Belmont semi-custom costs more because it’s built specifically for your layout. True full-custom cabinetry costs the most because every box, panel, and insert is made to your kitchen’s exact dimensions, nothing off the shelf.

Stone grade. Quartz is the baseline because it’s engineered and consistent to fabricate. Quartzite and marble cost more because they’re cut from natural slabs that require more careful selection and cutting. A waterfall edge, where the stone wraps continuously down the side of an island, costs meaningfully more because it needs a second slab section cut and pattern-matched to the top, plus extra fabrication time to get the seam invisible.

Adding a pantry. This isn’t just a box in the corner. It’s added cabinetry, shelving, sometimes a new wall opening, and its own lighting and outlets, all real added labor.

Moving walls. Removing or relocating a wall, especially a load-bearing one, requires structural engineering and often a new beam, which is why it’s one of the biggest single jumps in any remodel.

Moving plumbing. Relocating a sink, or adding a wet bar or pot filler, means running new supply and drain lines to a different spot in the room, not just disconnecting and reconnecting where it already sits.

Adding electrical. New circuits for an island, additional outlets, or a panel upgrade to support it all add real cost, because it’s licensed electrical work, not a DIY swap.

Under-cabinet lighting. This is separate wiring and separate fixtures from the main kitchen lighting, which is why it’s never included by default, at any tier.

What We’ve Learned Homeowners Don’t Expect

A few patterns we see over and over, based on projects we’ve completed throughout Buda, Kyle, and South Austin:

Most homeowners overestimate what appliances will cost them and underestimate what cabinetry will cost. Cabinetry is almost always the single largest line item in the project, more than stone, more than fixtures, more than anything else.

Moving plumbing rarely stays a plumbing-only problem. Once a sink or dishwasher moves, it usually touches electrical (for a disposal or under-sink outlet) and sometimes flooring, since the old plumbing location needs to be patched.

Removing one wall creates work well beyond the wall itself. Once a wall comes down, you’re usually also looking at new electrical runs, HVAC register relocation, and drywall texture matching across a much bigger area than the wall alone.

Keeping your existing layout is still the single biggest way to control cost. It’s not glamorous advice, but it’s the truest thing we can tell you.

Real Projects, Real Numbers

A Buda kitchen that kept its original footprint. The layout already worked, so the homeowners put their full budget into J&K cabinetry and quartz counters instead of moving a single pipe. That’s the cosmetic tier working exactly as it should.

A Bee Cave kitchen that opened up the whole floor. This one meant removing a load-bearing wall between the kitchen and dining room, engineering a new beam, and rerouting an HVAC supply run that used to sit inside that wall. That single wall touched three different trades before it was done.

A Kyle kitchen built around a large island addition. Adding the island meant new plumbing for a prep sink, new electrical circuits for outlets and under-cabinet lighting, and reworking the surrounding cabinetry to fit the new footprint.

A Westlake Hills custom kitchen with a quartzite waterfall island. Two slabs were cut and matched so the veining ran continuously from the countertop down both sides of the island, a detail that takes real time in the fabrication shop and drives cost up on its own, separate from the cabinetry.

Tier 1: Cosmetic Kitchen Refresh ($30,000–$50,000)

Over the years, we’ve found this tier works best in homes where the layout already does its job and the footprint doesn’t need to grow, the finishes just feel dated. Because walls and plumbing stay exactly where they are, this tier moves faster and costs less.

Cabinetry at this tier is J&K Cabinetry, a modular option built with maple wood and plywood construction, either refacing existing boxes or installing new ones. Countertops are quartz through Architectural Surfaces or Arizona Tile. Backsplash and fixtures update with Moen or Delta.

One thing we see homeowners misunderstand about this tier: a cosmetic refresh doesn’t mean settling. Done right, it completely changes how the kitchen feels, even though the footprint, walls, and plumbing never move.

Tier 2: Mid-Range Kitchen Remodel ($50,000–$85,000)

This is where most of our South Austin, Buda, Kyle, and Dripping Springs clients land, because they want more than new finishes. They want a better layout, more cabinets, or an island.

Cabinetry here is either Belmont, a USA-made semi-custom line, or an upgraded J&K modular configuration, both with soft-close hinges and drawers standard. Quartz remains the standard countertop, with quartzite available for homeowners who want a more natural stone look.

Minor layout adjustments are common: relocating a sink within the same general plumbing zone, adding or extending an island, or opening a pass-through. If a pantry is being added at this tier, that’s additional cabinetry and often a new opening. Under-cabinet lighting and an added circuit or two for an island also become common asks here, and both add to the total.

Tier 3: High-End Custom Kitchen ($90,000–$150,000+)

At this level, we’re rebuilding the kitchen, not upgrading it. Common across West Austin, Rollingwood, Westlake Hills, Lakeway, and Bee Cave, where homeowners want their kitchen to be the showpiece of the home.

Two cabinetry paths live at this tier, and they’re not the same thing. Belmont semi-custom is USA-made and built to your layout, a strong option for most Tier 3 projects. True full-custom cabinetry goes a step further, made to your kitchen’s exact dimensions with integrated panels and specialty storage built from scratch. Quartzite and marble are the standard stone selections at this tier, and a waterfall island is one of the signature upgrades clients choose here.

Structural work is where this tier really separates from the others: moving or removing walls, relocating plumbing to a new island or wet bar location, adding a full walk-in pantry, and rerouting HVAC to support a larger or reshaped kitchen. Full electrical rework, including under-cabinet lighting, added circuits, and panel upgrades, is commonly part of the scope here rather than an add-on.

Why Every Pro Tech Kitchen Starts With a 3D Rendering

This is one of the things that actually separates us from most general contractors, so it deserves its own explanation, not just a mention.

Before any construction starts, we build a full 3D rendering of your finished kitchen. You see the actual cabinet color, the actual stone selection, the lighting layout, and the finished layout, in photorealistic detail, before a single wall comes down.

The reason this matters isn’t just that it looks nice. It’s that most expensive change orders happen because someone didn’t realize what they were approving until they saw it built. A rendering catches that mismatch on a screen instead of in your framed-out kitchen. It also means your material selections and layout decisions are locked in before demolition, so we’re not making decisions mid-project that push your budget or your build sideways.

The Construction Standards Behind Every Kitchen

The visible finishes get the attention, but what’s behind them is what determines whether a kitchen holds up. On every project, that means cement board in wet areas rather than standard drywall, Hydro Ban waterproofing anywhere water exposure is a risk, and Mapei mortars and grouts for tile work, the same waterproofing logic we’ve trusted in bathrooms for 45 years applied wherever it’s relevant in a kitchen.

Cabinetry installation includes soft-close hinges and drawers as standard, not an upgrade. Stone fabrication is done to match seams and edges precisely, particularly on waterfall installations where a visible seam ruins the effect. Ventilation is sized and routed correctly for the range being used, and finish carpentry, trim, and transitions are handled by the same team building the rest of the kitchen. Electrical and plumbing work is performed by licensed trades on every project.

Hidden Costs Homeowners Don’t Think About

Beyond cabinetry and stone, a few things catch homeowners off guard if nobody mentions them upfront:

Electrical upgrades. Older homes in Austin and the surrounding areas sometimes need panel capacity increased to support new circuits for an island or additional lighting.

Plumbing relocation. Covered above, but worth repeating here because it’s one of the most common surprises.

Structural beams. Needed anytime a load-bearing wall is altered or removed.

HVAC relocation. Moving supply or return vents that used to sit inside a wall that’s now gone.

Drywall repair and texture matching. Once a wall comes down or plumbing moves, the surrounding drywall needs patching, and matching existing texture across a larger area takes real skill.

Flooring repairs after cabinet removal. Flooring underneath old cabinets often doesn’t match what’s exposed once those cabinets come out, especially in older homes.

Gas line relocation. If a range is moving to a new spot in the room, the gas line has to move with it.

None of these are add-ons we tack on to pad a number, they’re real work that shows up once demolition starts, which is why we walk through them with you before we ever break ground.

Our Process, Start to Finish

  1. Consultation. We meet at your home, see the space, and listen to what’s not working for you.
  2. Measure and evaluate the space. We take real measurements and assess plumbing, electrical, and structural conditions.
  3. 3D rendering. You see your finished kitchen before any decisions are finalized.
  4. Material selections. Cabinetry, stone, and fixtures are chosen and confirmed.
  5. Detailed proposal. A clear, itemized understanding of scope, so there are no surprises about what’s included.
  6. Construction. Our crews handle the work directly, not a rotating cast of subcontractors.
  7. Final walkthrough. We walk the finished kitchen with you before we consider the job done.

What We Wish Every Homeowner Knew Before Remodeling

A few things we tell every client, based on decades of doing this:

Layout matters more than square footage. A smaller kitchen with a smart layout often outperforms a bigger one that wasn’t planned well.

Cabinets usually drive the budget, more than stone, more than fixtures. If you’re trying to control cost, start there.

Spending more isn’t always the answer. A well-executed cosmetic refresh can outperform a rushed high-end remodel.

Planning early saves money. Decisions made before demolition are cheap. The same decisions made mid-project are expensive.

Quality installation matters more than expensive materials. The best quartzite in the world looks bad with a sloppy seam. The right materials still need the right hands.

Frequently Asked Questions

How much does a kitchen remodel cost in Austin, TX?
Most Austin kitchen remodels run $30,000 to $150,000+. The real driver isn’t square footage alone, it’s cabinet grade, stone selection, and whether walls or plumbing are moving.

Does cabinet brand affect the price?
Yes. J&K modular costs less than Belmont semi-custom, and true full-custom cabinetry costs the most.

Does the type of countertop matter?
Yes. Quartz is the baseline. Quartzite and marble cost more, and a waterfall edge adds further because of the extra slab and fabrication involved.

Does adding a pantry increase the cost?
Yes. A pantry adds cabinetry, shelving, and sometimes a new wall opening.

Does moving the sink or island add cost?
Yes. Relocating plumbing means running new supply and drain lines to the new location.

Does adding under-cabinet lighting cost extra?
Yes. It’s separate wiring and fixtures, so it’s not included by default at any tier.

Does Pro Tech supply or install appliances?
No. Appliance selection and purchase is handled by the homeowner. We build the kitchen to fit whatever appliances you choose.

Does every project get a 3D rendering, or just the expensive ones?
Every project, at every tier. Cosmetic, mid-range, and full custom kitchens all start with a 3D rendering before construction begins.

Do you serve the Austin suburbs?
Yes, South Austin, Buda, Kyle, West Austin, Bee Cave, Westlake Hills, Lakeway, Rollingwood, Wimberley, Dripping Springs, and San Marcos.

A Note on What’s Next

If you’re weighing a kitchen against a bathroom remodel, or want to understand quartz versus quartzite, cabinet refacing versus replacing, or how a Belmont build compares to true full-custom, we’re building out dedicated guides on each of those so you can dig deeper without guessing.

Ready to Start Planning Your Kitchen?

Every kitchen is different, which is why online price ranges can only get you so far. The layout of your home, the cabinets you choose, the type of countertops, and whether you’re moving walls or plumbing all play a role in the final investment.

Our goal is never to pressure you into spending more than you need. It’s to help you understand your options, explain where your money is going, and design a kitchen that fits your home, your lifestyle, and your budget.

If you’re thinking about remodeling your kitchen in Austin, Buda, Kyle, Dripping Springs, Bee Cave, Lakeway, Westlake Hills, Rollingwood, Wimberley, San Marcos, or the surrounding areas, we’d be happy to walk through your space, answer your questions, and create a 3D rendering so you can see what’s possible before construction ever begins.

Call Pro Tech Construction at 512-720-8303 or reach out through our website to schedule your consultation. We’d love the opportunity to help you create a kitchen you’ll enjoy for years to come.

At Pro Tech Construction, we believe an informed homeowner makes the best remodeling decisions. Whether you’re ready to start next month or just gathering information, we’re here to be a resource.

Top Rated shower remodel contractor - Pro Tech Construction

How Much Does a Bathroom Remodel Cost in Austin, TX (2026 Guide)

Bathroom remodel cost Austin TX pricing runs between $8,000 and $90,000 in 2026. Cosmetic refreshes start around $8,000. Mid-range renovations run $20,000 to $45,000. High-end primary suite remodels run $50,000 to $90,000.

Two homeowners can get wildly different quotes for what sounds like the same project. In our experience, the reason usually comes down to one thing: what’s happening behind the tile, not what’s visible on top of it. We’d rather explain that upfront than let you find out later. Below, we break down bathroom remodel cost Austin TX pricing into three tiers. These are based on real projects we’ve built across the Austin area, including South Austin, Buda, Kyle, Dripping Springs, and Wimberley. We also work in Bee Cave, Lakeway, Westlake Hills, Rollingwood, Manchaca, Driftwood, Circle C, Barton Creek, and San Marcos. For example, see our full process on the Austin Bathroom Remodeling page. Or learn more about our 45-year history.

Bathroom remodel cost example: completed project by Pro Tech Construction in Austin, TX
A recent Pro Tech Construction bathroom remodel in the Austin area.

Bathroom Remodel Cost Austin TX: Pricing at a Glance

Remodel Tier Typical Cost Range What You Get
Cosmetic / Budget $8,000 – $18,000 Tile surround retile with the existing tub kept in place, new fixtures, paint
Mid-Range $20,000 – $45,000 Full tub-to-shower conversion, new tile, semi-custom vanity, quality fixtures
High-End / Primary Suite $50,000 – $90,000 Custom tile, frameless glass, freestanding tub, custom cabinetry, layout changes

These bathroom remodel cost Austin TX ranges reflect actual projects from 2026, not a national average. However, your specific number moves with size, layout, and material choices. For additional context, see this Cost vs. Value data on bathroom remodels.

Tier 1: Cosmetic / Budget Bathroom Remodel ($8,000-$18,000)

Austin bathroom before a cosmetic remodel by Pro Tech Construction
Before: dated finishes, functional layout.
Austin bathroom after a cosmetic remodel by Pro Tech Construction
After: same layout, retiled and refreshed.

We commonly see this tier in homes built in South Austin, Buda, and Kyle during the 1990s and early 2000s. The layout still works and the plumbing holds up, but the finishes have aged out. If your tub is in good shape, there’s no reason to pay for a full rebuild. That’s especially true if you don’t need more space or a different layout.

At this level, the tub stays in place and we retile the surround completely. We use the same waterproofing system on every shower we build, regardless of budget. That means Hydro Ban membrane and cement backer board, every time. We replace the vanity with J&K Cabinetry, a modular line built with real maple wood and plywood box construction. That’s a step up from the particleboard and plastic hardware common in big-box stock vanities. We round it out with new Moen or Delta fixtures, updated floor tile, lighting, and paint.

One thing we’ve noticed: homeowners often assume “budget” means lower quality. It doesn’t, at Pro Tech it means a smaller scope, not a shortcut. We build the waterproofing behind a $12,000 retile exactly the same way we build it behind a $90,000 primary suite.

Tier 2: Mid-Range Bathroom Remodel ($20,000-$45,000)

Mid-range bathroom remodel cost example: walk-in shower conversion in Austin, TX
A finished mid-range tub-to-shower conversion with full tile replacement and quality fixtures.

This is where most of our South Austin, Dripping Springs, Buda, Kyle, and Wimberley clients land. It’s usually driven by one decision: converting an old tub into a walk-in shower. We usually recommend this when a homeowner has at least one other tub elsewhere in the house. Removing the only tub in a home is worth thinking through for resale before you commit.

A tub-to-shower conversion at Pro Tech means the tub comes out. We rebuild the space from the studs. That means new waterproofing membrane and cement backer board. Then a full tile installation, not a liner dropped over the old tub. Vanity options at this tier are J&K Cabinetry or Belmont. Both are well-established USA-made cabinet manufacturers we trust for real wood construction. We pair that with quartz countertops sourced through Architectural Surfaces or Arizona Tile. Add a frameless or semi-frameless glass enclosure, plus Kohler, Moen, or Delta fixtures. Heated floors can be added here as well.

In our experience, clients get the most value for the money at this tier. You’re getting a genuinely rebuilt shower, not a resurfaced one, at a price point that’s still very achievable. If you’re also weighing a kitchen project alongside your bathroom, see our kitchen remodeling services for similar tier-based pricing.

Tier 3: High-End / Primary Suite Remodel ($50,000-$90,000)

High-end bathroom remodel cost example: primary suite with freestanding tub in Austin, TX
A high-end primary suite remodel featuring a freestanding soaking tub and custom tile.

We build most of our high-end primary suite work in West Austin and Rollingwood. Westlake Hills, Lakeway, Bee Cave, and Barton Creek round out that list. The goal here isn’t just a working bathroom, it’s a retreat that improves daily life.

Cabinetry at this level is Belmont in a custom stain color matched to the home. A fully custom cabinet build is also an option. We combine that with natural stone, quartzite, marble, or book-matched slabs selected in person at Architectural Surfaces or Arizona Tile. Add a spa-style shower with multiple showerheads and a linear drain. Then a freestanding soaking tub, radiant floor heat, and premium fixture lines from Kohler, Delta, or Moen round it out.

Before we demo anything at this tier, we walk clients through a 3D rendering of the finished space. In our experience, seeing the tile, cabinetry, and lighting decisions rendered ahead of time helps avoid regret. The biggest one in a high-end remodel is not knowing what you were actually getting until it’s built.

How We Build Every Shower, No Matter the Budget

We’ve found that what’s behind the tile matters more than the tile itself. This is the one place we won’t cut corners, regardless of what tier a project falls into.

For over 45 years, Pro Tech has built every shower pan the same way. We use a full waterproofing system with Hydro Ban and MAPEI products over cement backer board. We also use a solid concrete block curb instead of the 2×4 wood framing a lot of contractors still use. A wood curb sits in a wet environment every day of its life. Over time it absorbs moisture and rots. It becomes a place for mold to grow, even when the tile on top still looks perfect. Concrete block doesn’t rot, doesn’t mold, and doesn’t need to be torn out and rebuilt in a few years.

We don’t charge extra for this, it’s simply how we build. Honestly, it’s also the biggest reason our showers hold up decades after the tile goes in. A lot of other remodels start failing quietly behind the walls long before that.

Bathroom Remodel Cost Austin TX: Frequently Asked Questions

Here are the questions we hear most often about bathroom remodel cost Austin TX pricing.

What is bathroom remodel cost Austin TX pricing on average?

Bathroom remodel cost Austin TX pricing runs $8,000 to $90,000 on average. Cosmetic tile surround retiles start around $8,000. Mid-range tub-to-shower conversions average $20,000-$45,000. High-end primary suite remodels run $50,000-$90,000. See completed bathroom remodels for real examples at each tier.

Should I convert my tub to a walk-in shower, or keep the tub?

It depends on the rest of your home. Many buyers respond well to converting a primary bathroom into a walk-in shower right now. That’s especially true if you have at least one other tub elsewhere. If it would be the only tub left in the house, that’s worth a real conversation first. We’ll walk through it with you before removing it.

How much does a tub-to-shower conversion cost?

In our mid-range tier, this typically runs $20,000-$45,000 depending on shower size, tile, and glass enclosure. Every conversion we do includes a full waterproofing rebuild from the studs out, not a liner over the existing tub.

What cabinet brands does Pro Tech use for bathroom vanities?

Our cosmetic and mid-range tiers use J&K Cabinetry, a modular line built with real maple wood and plywood construction. Mid-range and high-end projects can also use Belmont, a trusted USA-made cabinet manufacturer. That includes custom stain colors or fully custom builds at the high-end tier.

How much does an accessible or aging-in-place bathroom remodel cost in Austin?

Accessible features like curbless walk-in showers, grab bars, wider doorways, and comfort-height fixtures typically fit into the mid-range to high-end tiers above. The exact fit depends on scope. More than one in four older adults report a fall each year. Bathrooms are one of the most common places it happens, according to the CDC. We build accessible, ADA-informed bathrooms in both Austin and Albuquerque. It’s part of our standard remodeling work, not a separate specialty.

Accessible bathroom remodel cost example: roll-in shower with grab bars, Austin and Albuquerque
A curbless roll-in shower with a built-in bench and grab bars. This is part of Pro Tech’s accessible remodeling work in both Austin and Albuquerque.

How do I choose a bathroom remodel contractor in Austin?

Ask to see recent local projects, and confirm they’re licensed and insured. Also ask specifically who builds the shower waterproofing system, not just who installs the tile. We’ve built every shower the same trusted way for over 45 years. We’re always glad to walk homeowners through exactly how.

Why does the shower curb matter in a bathroom remodel?

The curb sits in constant moisture. Built with wood, it can rot and mold within a few years, even under good tile. We build every shower curb with concrete block, because it doesn’t break down over time the way wood does.

What Determines Your Bathroom Remodel Cost Austin TX Number

Every bathroom is different, and these tiers are a starting point, not a quote. Layout changes, plumbing relocation, and material selection all move the number. Ultimately, we’d rather walk you through the real reasoning behind your specific bathroom remodel cost Austin TX estimate. We won’t just hand you a flat number that doesn’t reflect your home. Ideally, we back that up with a 3D rendering so you can see the space before committing.

Ready to get a real number for your project? Contact Pro Tech Construction for a bathroom remodel cost Austin TX estimate, or see completed bathroom remodels in Austin and the surrounding area.

Pro Tech Construction | Austin, TX | 512-720-8303